KLG Jones provided full commissioning
services for the Mechanical
and Electrical Systems
in the building as required for
LEED certification. Mechanical
systems included rooftop air
handling units for the main plant
and a VAV system for the front
office. Natural gas was the primary
source of heating for the
rooftop equipment with electric
heat at the VAVs. Lighting
controls were primarily an occupancy
sensor based system
for the interior with a photocell
and time clock based system
for the exterior.
The facility is comprised of
a fully conditioned 400,000
square foot manufacturing plant
with a Low Bay, Medium Bay
and a High Bay each housing
mini-factory pods with various
levels of security. The 65,000 square foot
three-story front office contained
office environments from
a spacious front lobby, private
offices, open cubicle office areas,
conference rooms, locker
rooms and a large secure office
space. The front office also
contains a small servery and
kitchen.